• pic_02
  • pic_03
  • pic_04
  • pic_01

The brief was to maximise the accommodation on the site within a tight budget. This was further complicated by the presence of previous unfilled cellars which necessitated using piled foundations.

The building has a steel portal frame with a natural slate roof and a mixture of natural stone and brick walls.

The basic structure was included during construction for a first floor.